How do you write a construction method statement?
What Do I Need to Include in My Method Statement?
- The name of the project and its reference.
- A brief summary of what the work is.
- Where the work is taking place (address).
- Start and expected completion dates for the work.
- The issue date and the unique document number.
- Details about the company carrying out the activity.
How do you draft a method statement?
Begin to write your method statement, starting at the header.
- A standard operating procedure or title.
- A site address.
- Your company name, address, logo and identifying details.
- Projected start and end dates for task.
- A description of the work to be conducted.
- The method statement’s author and health and safety contacts.
What is a contractor method statement?
Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.
Who prepares construction method statement?
Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.
What is method statement example?
For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.
Is a method statement a legal document?
So while they may not be a specific legal requirement, method statements are a way of complying with the law by making appropriate arrangements for preventive and protective measures and providing information and instruction to the workforce.
What should be included within a method statement?
A method statement should also include:
- Name of the company.
- Start and completion dates.
- Location of where the task will be carried out, including address.
- Site contact details, including Site Supervisor and who to contact in case of emergency.
- Name of person who completed the method statement.
Do I need a method statement?
Method statements are not specifically required by law in the same way that risk assessments are. But they can help you to comply with the law and the need to carry out your work safely. They are used to provide information and instruction to your team, which is a legal requirement.
Is a method statement a legal requirement?
While not required by law, method statements are also prepared for many other construction activities and are proven to be an effective and practical way to help plan, manage and monitor construction work.
Is a method statement the same as a risk assessment?
In the simplest terms: a risk assessment analyses the risk in the workplace, whilst a method statement outlines what is being done to prevent risk.
How detailed should a method statement be?
Your method statement doesn’t have to be a lengthy document, but it should contain all the information you need to communicate how to do the work safely. The information should be clear and concise.
What is the difference between a risk assessment and a method statement?
How do you write a construction method?
5 Steps to Write Effective Construction Method. 1 Step 1: Draft the Structure. Draft a structure for your statement. Make in simple for better understanding. You can use MS Word as an application for 2 Step 2: Site Details. 3 Step 3: Developer’s Details. 4 Step 4: Write the Methods. 5 Step 5: Revise the Sheet.
How to write a method statement for a project?
5 Steps for Creating a Method Statement 1 Create a Word File. Create an MS Word file on your computer. 2 Site Details. This portion will consist of the specific details of the site where a certain project is taking place. 3 Supervisor and Emergency Contact Details. 4 Details of the Tasks. 5 Precautionary Steps.
How big is the construction method statement template?
Construction Method Statement Template Size: 189.7 KB If you want to prepare a statement of construction where the developer will answer all the required questions for the proper documentation process, then download this Construction Method Statement Template to prepare the report.
Why do we need to prepare a method statement for construction?
For any construction activity now this is mandatory to prepare a standard method statement. This helps workers and engineers to understand before start of the work the exact requirements. First thing that workers come to know is the scope of work the method statement is covering and area of work as well.